August 2022

IUIG

Successfully completed the International Students Hostel Building at Vidyanagari Campus of University of Mumbai. The building was inaugurated by Hon’ble Chancellor, University of Mumbai and Governor of Maharashtra Shri Bhagat Singh Koshyari.  Our Shri. Hitesh N. Sardesai, Director (Planning & Development) was attended the function.

IUIG Read More »

MMRDA Kalamboli

Successfully completed Consultancy Services for Detailed Engineering, Project Management and Proof Checking of the Designs for the Proposed Work of Construction of Flyover at Kalamboli Steel Yard Junction and at Navade Junction on old Mumbai for Mumbai Metropolitan Region Development Authority (MMRDA).

MMRDA Kalamboli Read More »

AE Nanded

Successfully completed Authority’s Engineer for supervision of Rehabilitation and Upgradatin of Barasgaon to Rahatee Bu.(Mah/AP Border) Section of NH-222 from existing Km. 558/200 to Km. 615/000 in the State of Maharashtra to two lanes with paved shoulders on EPC basis under NHDP-IV for Ministry of Road Transport & Highways (MoRTH).

AE Nanded Read More »

AE Abohar

Successfully completed Consultancy Services for Authority Engineer for Supervision of Rehabilitation and Up gradation to 2 Lane with paved Shoulders of Abohar- Sito Gunno -Dabwali Road from Km.0.00 to Km.50.885 of NH-354E including one High Level Major Steel Bridge for Ministry of Road Transport & Highways (MoRTH).

AE Abohar Read More »

AE Mudki

Successfully completed Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation & Up-gradation to 2 Lane with paved shoulders of Mudki to Jawahar Singh Wala Section of NH-254 from Km. 0.00 to 38.00 in the State of Punjab on EPC Mode for Ministry of Road Transport & Highways (MoRTH).

AE Mudki Read More »

GHMC Hi-tech city flyover

Successfully completed Project Management Consultancy Services for Proof Checking, Construction Supervision, Quality Assurance, Quality Control & Quality Audit for the work of “Construction of approaches to ROB, Service Roads, Kerbs, Storm Water Drains along with Footpath, Median, Street Light Works, Staircases to ROB at Km 170/40-2 between Hi-tech City and Borabanda Station for 4 lane

GHMC Hi-tech city flyover Read More »